Nugroho, Revy Adrian, and Abdul Wahid Nuruddin. “EVALUASI PELAKSANAAN PROYEK FIXED BRIDGE MENGGUNAKAN METODE CPM DAN PERT : Studi Kasus Di Bandar Udara Sultan Hasanudin Makassar”. Prosiding SNasPPM, vol. 6, no. 1, Aug. 2021, pp. 485-90, http://prosiding.unirow.ac.id/index.php/SNasPPM/article/view/974.